MAPEI Warehouse tilbury Delta

OCTOBER 2009
24,000 Sq Foot

SUPERTHERM ® meets the ASHRAE 90.1 code compliance and Part 10 of the BC Building Code 2012. It also has a Flame Spread of 0 and Smoke Developed 0 as per the CAN/ULC-S102 Equivalency Letter.

SuperTherm Tilt-up Concrete Insulation Advantages

Update: This building is now LEED - Leadership in Energy & Environmental Design Certified

NOVEMBER 2012

3 Year Follow-up: "SUPERTHERM ® is still working as intended keeping it warm." -- Bob Folley, Warehouse Manager.

Preparation for SUPERTHERM ® application, Pressure Wash to remove form release agent to a clean, dry and sound substrate, ready to accept coating system. Being A LEED project we were not allowed to use TSP and had to rely on water only to remove the form oils. Consequently we performed adhesion tests to verify the surface preparation was sufficient prior to full application.


#1 #2
#3 #4
#5 #6
#7 #8

SUPERTHERM ® applied to tilt up concrete wall 2 coats cross hatched to a total of 17.82 mils WFT = 9.98 mils DFT.
#9 #10
#11 #12
#13

Architect: Raffaele Greco
Greco Design and Construction.

General contractor: Prism Construction
Project Manager: Alex Manzi

Certified Contracter: Combined Painting