WHITE ROCK PLAYHOUSE
June
2006
Concrete Building prepped and primed with SUNSHIELD 2000 ®, then top coated with SUPERTHERM ® for long lasting protection and superior insulation properties.
Preparation of Concrete Wall ![]() |
Openings Masked off ![]() |
Check Wet Film Thickness with Mil Gauge ![]() |
|
Preparation of Concrete Wall ![]() |
|