Nittany Lion Inn
Pennsylvania State University 2001
Problems
- 10 year old EPDM roof system is developing leaks at multiple
locations.
- Seam Failure and deteriorated neoprene flashing's
|
Application
- Surface Preparation
- Key to application of any coating
- Power Wash
- Solvent Clean


- Allow meshed work to set up and then coat remainder of membrane
with SUPER BASE
HS ®.

- Apply two coats of SUPER THERM
® Ceramic Roof Coating at a rate of 100 sf per gallon

- Apply final top coat of ENAMO-GRIP
® to protect SUPER
THERM ® Ceramic Roof Coating
from ponding water.

- Final top coat of ENAMO-GRIP
® prevents dirt from bonding to the Super Therm
Ceramic Roof Coating during the curing process.
- Available in clear, white, and custom colors
- SUPERTHERM ® provides the added environmental
benefit of a reduced HEAT
ISLAND EFFECT.

 |
|