Office roof

Existing coating was applied in 2007 10 Mils DFT SUPERTHERM ® over HLM 5000 no maintenance has been performed since.
(no clean up of debris on the roof)

July 2012
Roof Maintenance

First we cleaned the surface of the roof to a clean, dry and sound condition ready to accept a new coating system.
Prep work Prep work
An additional 8 mils WFT = 5 mils DFT of SUPERTHERM ® was added over the whole roof.
supertherm_patching supertherm_patching
supertherm_patching supertherm_patching
Pre Striped then applied first coat of SP LIQUID MEMBRANE ® at 8 mils WFT
First Coat First Coat
applied Second Coat cross hatched of SP LIQUID MEMBRANE ® at 6 mils WFT for a total of 14 mils WFT = 6 mils DFT
Second Coat Second Coat